New Hotel Crystal Chandelier Ceiling Lighting From Dayong

FOB Reference Price:Get Latest Price
$30.00 - $300.00 / Piece | 1.0 Piece/Pieces (Min. Order)
Color:
Emitting Color:
Warm White White Cold White
Shipping:
Support Sea freight
Lead Time:
Quantity(Pieces) 1 - 10 >10
Est. Time(days) 20 Negotiable
Report Suspicious Activity
Overview
Quick Details
Lighting solutions service:
Lighting and circuitry design
Place of Origin:
Guangdong, China
Brand Name:
SHRINE
Model Number:
SC124
Material:
Steel
Type:
Contemporary
Light Source:
Energy saving
Number of Lights:
/
Lamp Luminous Flux(lm):
/
Working Lifetime(Hour):
/
Beam Angle(°):
/
Input Voltage(V):
110
CRI (Ra>):
/
Support Dimmer:
No
Application:
Residential
Warranty(Year):
3-YEAR
Color:
Silver
Certification:
CE FCC RoHS SAA GOST
Lamp holder:
GU10
MOQ:
10 pcs for wholesale
Power:
50W LED
Size:
Size can be customized
Supply Ability
Supply Ability:
5000 Piece/Pieces per Month
Packaging & Delivery
Packaging Details
Package For Chandelier Lighting
1. Lamp frame SKD (semi Knock Down) packing with Styrofoam inside.
2. The crystal beads are packed with poly bag and foam.
3. A=B five layer standard waterproof brown carton especially for exportation.
4. Information of package printed in English or other language required.
5. Every package is offered with English installation instruction and pictures.
Port
shenzhen guangzhou zhongshan
Lead Time :
Quantity(Pieces) 1 - 10 >10
Est. Time(days) 20 To be negotiated

Zhongshan Da Yong Lighting Co.ltd is a professional Manufactory for all kinds of indoor lighting,

such as chandelier, ceiling lighting, pendant lighting, crystal wall lighting lamp, crystal table lamp and floor lamp.

Click here  to see more Lighting products  

 

SC0010 Modern Chinese Luxury Crystal Chandelier For Hotel 

Product Description

 

 Name New Hotel Crystal Chandelier Ceiling Lighting From Dayong
Brand SHRINE
Model SC124
Size  Size can be customized
Material Crystal, Mirror Finish Stainless Steel
Voltage 110V
Warranty 3 YEARS
Certificate ROHS,CE,FCC,SAA,GOST,3C
Color Crystal, Mirror Finish Stainless Steel
Bulbs: GU10  LED
Delivery

Within 20-35 days since deposit received.

Lead time can be shortened when the order is urgent.

Payment

Paypal, T/T, L/C, Western Union

 30% deposit before production, 70% balance settled before delivery.

 Application Hall, Buildings, Living room, etc
Remarks

 Basic assembly is necessary.

 Instruction manual is included.

 

 

 

 Production Picture: